You don't have javascript enabled. Good luck with that.
Pencarian
       12 Halte Akan Dibangun di Jalan Layang Transjakarta
.
photo istimewa - Beritajakarta.id

City WIll Build 12 Bus Stops at Transjakarta Corridor XIII

As many as 12 bus stops will be built along the flyover of Transjakarta bus lane Corridor XIII route Ciledug- Blok M - Jalan Tendean.

 A total of 12 bus stops will be built on the flyover of Transjakarta Corridor XIII

Jakarta Public Work Agency Head of the Intersection Division, Heru Suwondo said, the 12 bus stops will be spread in eight areas.

"A total of 12 bus stops will be built on the flyover of Transjakarta Corridor XIII," said Suwondo, Monday (2/16).

2016, City will Complete 8 Transjakarta Flyovers

Suwondo added, the bus stop will be placed one or two units in each area and will be constructed by the contractor winners of the Corridor XIII project. The area that will be built one bus stop including Tendean area (Trans TV bus stop), Santa area (Rawa Barat bus stop), Taman Puring area (MRT Station bus stop) and Trunojoyo area (Tirtayasa bus stop).  

"While the area with two units bus stop are located in Kebayoran Lama area (Kebayoran Baru and Taman Puring bus stop), Seskoal area (Seskoal and Carrefoour area ), the Kostrad area (Swadarma and Cipulir bus stop) and Adam Malik area (Budi Luhur and JORR W2 area )," he added.

Heru continued, the flyover project are divided into 8 packages such as Adam Malik package (1,350 meters), Kostrad package (1,400 meters), Seskoal -  Ciledug Package ( 1,500 meters), Taman Puring package (1,200 meters), Kebayoran Lama packages (1,300 meters), Trunojoyo package (1,375 meters), Santa package (1,250 meters) and Tendean package (1000 meters).

Linked News
Popular News indeks
  1. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye306 personDessy Suciati
  2. Pramono Ensures KJP will Continue to Be Distributed

    access_time26-06-2025 remove_red_eye304 personDessy Suciati
  3. Governor Pramono: Jakarta E-Prix 2025 in Ancol is Amazing!

    access_time21-06-2025 remove_red_eye269 personDessy Suciati
  4. Here are Parking Spaces around Lapangan Banteng for Jakarta's Anniversary

    access_time21-06-2025 remove_red_eye266 personAldi Geri Lumban Tobing
  5. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye253 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik